Injectable Adhesive – VI 1101

Injectable Vinylester-Based Structural Chemical Anchor

The injectable adhesive VI 1101 is a high-performance and quick cure structural adhesive for anchorage of threaded bars and rebars in concrete and masonry. It has international certifications and approvals, ensuring quality to your work. In addition, it is possible to easily size you ideal anchorage system through the Hard DesignFix software.

The fire test

VI 1101 has the German certification F120 (Feuerwiderstansklasse), that certifies that the attachment was submitted to a fire test for 120 minutes without losing its physical and chemical properties. Therefore, the anchorage withstands 2 hours of flames attack.
It contributes to the safety against fire estimated by the legislation, regulated by the permit issued by the Fire Department (Fire Department Inspection Certificate – AVCB).

Quality assurance

VI 1101 has international approval that assures higher safety to your work. The certification ETA – 13/0564 – Option 1, assures that the VI 1101 passes tough the most comprehensive anchorage battery of tests, thus comprising the loads for application in fissured concrete, from 20 to 50 Mpa, combined traction and shearing loads, distance of edges and between anchorages, and application in regions of seismic tremor and high vibration rates.

Sizing with no difficulties

Using the injectable adhesive VI 1101 , you will have exclusive access to the Hard DesignFix software to easily size the ideal anchorage system specifications to your project, according to the main international standards.

 

Request a budget

Benefits

High productivity and performance
Chemical anchorage with international certifications
Excellent resistance to chemical substances
It waterproofs the hole
It allows applications in extreme environments, in addition to proximity to the sea (saline)
Resistance to high temperatures
Without styrene, can be applied in green works
Strongest quick cure system in the market
Calculation and sizing software

Applications

Attachment of facade support

Attachment of rebars for protrusions or cement shoes in pillars, beams and diaphragm walls

Anchorage of threaded bars for structural reinforcement

Installation of Life Line

  • Videos
  • Commercial Data
  • Technical Data
  • How to Use
  • Downloads

Package

  • Cartridge 345 ml
  • Box with 12 pieces

 

COMPOSITION:

  • Vinylester

PROPERTIES:

  • Consistency: Pastry (it does not leak)
  • Mix ratio: 10:1

 

CURE TIME

BASE MATERIAL TEMPERATURE WORK TIME CURE TIME – DRY BASE CURE TIME – WET BASE
-10ºC1 90 MINUTES 24 HORAS 120 HORAS
-5ºC 90 MINUTES 14 HOURS 28 HOURS
0ºC 45 MINUTES 7 HOURS 14 HOURS
5ºC 25 MINUTES 2 HOURS 4 HORAS
10ºC 15 MINUTES 80 MINUTES 160 MINUTES
20ºC 6 MINUTES 45 MINUTES 90 MINUTES
30ºC 4 MINUTES 25 MINUTES 50 MINUTES
40ºC 2 MINUTES 20 MINUTES 40 MINUTES

1 – For installation in base material with temperature within -10ºC and -5ºC, cartridges should be
stored at temperatures within 15ºC and 25ºC.

 

NOTES:

  • Base material temperature for installation: -10°C to 40°C
  • Product temperature for application: minimum: 5°C, excellent: 20°C
  • Material temperature after cured: -40°C to 120°C
  • Storage temperature: 5°C to 25°C
  • Shelf life: 18 months

 

Online calculator

Online calculator that simplifies the calculation of the amount of chemical anchor to be used in the project and/or in the work.

Calculate now

Budget for companies

Do you want to buy with your CNPJ? Click the button below and talk to one of our experts.

REQUEST A BUDGET